During the EuWireless consortium meeting #3 in Malaga, the first demonstration of the integration between EuWireless resources and the GÉANT Testbeds Service (GTS) was presented. The initial setup included a full installation of GTS with one Point of Deployment (PoD) at UMA – Malaga location. Reservation and activation of resources from the UMA PoD as part of pan-European virtual testbed slices were demonstrated by using the online GTS user interface. The demonstrated initial setup will be extended and validated with new resource types during the second year of EuWireless.
First Demonstration of EuWireless-GTS Integration